Index / S-200 Sheet 2 of 4 · Phase 02
Structural / Commissioning

Vertical Construction & Commissioning

We approach construction with the precision of engineers — then rigorously test and commission the envelope, HVAC, and mechanical systems to prove the home performs exactly as designed.

Fig. S-000 — Blower-door envelope verification Tested Before Trusted
S-200 / Scope of WorkPhase 02 — Foundation to Handover

Built like a machine. Tested like one.

Construction at Simons & Knapp is run with engineering discipline: one team sequencing every trade, holding every tolerance, and verifying quality at each milestone rather than at the end. Because the same firm engineered the envelope and specified the systems, nothing is lost in translation between the drawing and the jobsite.

And the job doesn't end when the drywall is painted. Before handover, the estate is commissioned like the advanced machine it is — the envelope pressure-tested and imaged, the HVAC balanced, every mechanical system proven against its design targets. You receive documentation, not assumptions.

Keynote ScheduleS-200
  1. K1Full-scope construction management, foundation to finish
  2. K2Trade sequencing & milestone quality control
  3. K3Envelope verification — blower-door testing & thermal imaging
  4. K4HVAC balancing & mechanical commissioning
  5. K5Controls verification & systems tuning
  6. K6Documentation, punch & owner orientation
Step 01

Build with Precision

Engineering-grade site management: one accountable team, every trade sequenced, every milestone verified.

Step 02

Test Everything

The envelope and mechanical systems are measured against the design targets set in pre-construction — not eyeballed.

Step 03

Commission & Hand Over

Tuned, documented, and walked through room by room. Turn-key, in the true sense of the word.